A: Testing is typically performed post second fix. With the following criteria having being completed:
• All service penetrations sealed
• Trickle vents installed
• Loft access hatch in place
• Plumbing complete with water in the traps
• Seals fitted on external doors
• Electrical outlets fitted
Visit the Air Tightness Solutions website for more information on Q: At what stage should we schedule Domestic testing?